Liquefied Petroleum Gas Tank
factory 鈽匫ur History 鈥?In 1986, heze huawang high pressure vessel
experimental plant of shandong academy of sciences was established. 鈥?In 1993,
he ze huawang high pressure vessel co., LTD. 鈥?In 1995, obtained the earliest
class D manufacturing qualification in the same industry in shandong province.
鈥?In 1998, entered the refrigeration market and produced the first refrigeration
auxiliary equipment. 鈥?In 2003, heze boiler factory was acquired. 鈥?In 2005,
obtained A2 design and manufacturing qualification in the same year. 鈥?In 2008,
the first 30m low-temperature liquid oxygen storage tank left the factory. 鈥?In
2009, a new plant at no. 766 lanzhou road was put into operation, with an added
capacity of 13,000 tons per year. 鈥?In 2011, heze huawang container cryogenic
products served China aerospace toray rocket base. 鈥?In 2012, heze huawang was
listed in the procurement list of China national offshore oil corporation. 鈥?In
August 2012, the company established the environmental protection research and
development department. 鈥?In 2013, the first 260-kilogram ultra-high pressure
vessel was delivered. 鈥?In March 2014, 766 lanzhou road added 25 mu of land.
鈥?In July 2014, heze huawang pipeline equipment installation co., LTD. 鈥?In
November 2015, our company successfully completed the Chinese space experiment
module. 鈥?In November 2015, strategic investment was made in beihai rural bank
co., LTD. 鈥?In December 2015, internal environmental protection r&d
department was independently established as shandong new danone environmental
protection technology co., LTD. 鈥?In 2015, the output value was 130 million
yuan, 11600T, and 2168 sets of products were completed in December. 鈥?In 2016,
A1 design certificate replacement was completed in June, and A1 manufacturing
certificate replacement was completed in July. 鈥?In January 2017, invested in
heze rongbang private financing registration service co., LTD. 鈽匫ur Factory In
1986, the company was founded in heze, shandong. Heze huawang pressure vessel
co., LTD. (heze huawang for short), established 34 years ago, insists on deep
cultivation of container manufacturing, has built shandong province cryogenic
container and cryogenic equipment research center, large-scale chemical
equipment manufacturing base, specializing in the production of liquefied gas
storage tank, cryogenic storage tank, refrigeration auxiliary machinery and
environmental protection equipment. Company is located in the city of peony heze
city high-tech economic and technological development zone, is located in
longhai economic zone and the big jingjiu economy cooperation with two economic
belt interchange, east and west, south and the industrial transfer in the front
position, and the level of jinan, Qingdao modern transport hub, is in the
central plains economic zone and the silk road economic belt two important node
location of national strategy. Current head office sets of heze peony district
huawang pipeline equipment installation co., LTD., heze emperor youzhu of
northern qi and natural gas energy co., LTD and shandong new danone
environmental protection technology co., LTD., a wholly owned subsidiary of
three, in addition the northern village bank equity investment co., LTD., heze
melt folk financing registration service co., LTD., etc. Several companies. The
company has developed into a design, manufacturing, production and installation
as one of the group companies, involving machinery manufacturing, finance,
service, environmental protection and other industries. The company has the
design and manufacturing qualification of A1\A2 pressure vessel issued by the
general administration of quality supervision, inspection and quarantine, and
the qualification of GB2/GC2 pressure pipeline installation. It was successfully
listed in Shanghai stock exchange on August 21, 2015. The company covers an area
of 143,000 square meters and has more than 480 employees, including 8 senior
engineers, 15 engineers, 5 doctors, 9 master students, 4 certified quality
assurance engineers, 43 certified senior welding technicians, 4 pressure vessel
design A audit personnel, 7 nondestructive testing personnel, and 3 certified
physical and chemical personnel. The lifting capacity is up to 160 tons, the
maximum cold coil is 120mm, the whole heat treatment furnace is 4.4mx5.5mx25m,
the paint room is one, two sets of large diffusion pumps, argon arc (GTAW),
submerged arc (SAW), CO2 protective welding (MIG) machine and other automatic
welding machines are complete; Testing equipment, X-ray, ultrasonic, magnetic
particle flaw detector, hydraulic universal testing machine, carbon and sulfur
analyzer, pendulum impact testing machine, impact projector, spectrophotometer,
helium simple leak detector, etc. 鈽匫ur Product 1. Design, manufacture and
installation of A1/A2 non-standard pressure vessels, heat exchangers, towers and
stirring reaction equipment. 2. Design, manufacture, installation and general
contracting services of LNG/ liquid oxygen/liquid nitrogen/liquid argon/liquid
carbon dioxide and other low-temperature storage tanks, large low-temperature
storage tanks, LNG filling stations, gasification stations and centralized gas
supply projects. 3. Design, manufacture, installation and other services of
ammonia refrigeration auxiliary equipment and cold storage at low and normal
temperature. 4. Design, manufacture and installation of titanium, zirconium,
nickel, bidirectional steel, haas alloy and other non-ferrous metal equipment.
5. Design, manufacture and installation of GB2/GC2 pressure pipes and pressure
vessels. 鈽匬roduct Application Nuclear power equipment, oil equipment, chemical
equipment, Marine special equipment, pressure vessel (A1, A2), pressure pipes,
refrigeration equipment, machinery, electrical equipment, environmental
equipment and relevant instruments and meters, accessories design, manufacture,
sales, maintenance and technical advisory services more intelligent
three-dimensional garage, intelligent hardware machinery and equipment research
and development, manufacture, promotion; Technology development, technology
transfer, technology consultation and service in the field of metal products,
chemical products, new energy and new materials 鈽匬roduction Market Our clients
are: China aerospace science and technology corporation, institute of physics,
Chinese academy of sciences, cnooc, sinopec, China huadian, yanchang petroleum,
shengli group, dongming petrochemical, yingde gas, meisel, fazikong, linde,
praxair, tsingtao beer, jinluo food, mengniu, China resources, shougang,
yankuang group and other domestic and foreign enterprise customers. 鈽匫ur Service
1. The company establishes files and service CARDS for users and visits users
regularly or irregularly. 2. As for the feedback of users' quality information,
the after-sales service department of the supplier shall respond within one
hour. If on-site service is required, the seller shall immediately prepare
maintenance materials and tools after receiving the direct and accurate
information from the buyer, and shall arrive at the site within 24 hours to
solve the problem. 3. During the quality guarantee period, the seller shall
repair or replace the tank free of charge if there is any quality problem caused
by the seller's design, manufacture or other reasons; After the warranty period
is expired, the service charges only the cost of repair or replacement,
providing the buyer with a lifetime of service. 4. The after-sales service
department of the seller shall have a quality tracking card for each equipment
provided by the seller to the buyer, which shall keep a detailed record of the
equipment purchased by the buyer and the repair and maintenance of the
equipment, so as to facilitate our understanding of the use of the buyer and the
quality tracking of the products sold by us. 5. The after-sales service
department of the seller shall visit or petition the buyer from time to time
every year to listen to the buyer's Suggestions and opinions on our products and
services, so that we can improve the quality of products and services and better
serve the buyer. 6. The seller shall provide free vacuum test of the storage
tank for life, and guarantee the welding seam of the storage tank for
life.Liquefied Petroleum Gas Tank factory
website:http://www.tank-madeinchina.com/ website2:http://www.huawangtank.com/
The Wall